References
These are just a few of the great clients we have had the pleasure of doing business with:
Independent
Del Webb
Ryland Homes
Shea Homes
Kaufman & Broad
Centex Homes
Pulte Homes
Greenbrier Homes
Greystone
Standard Pacific
Signature Properties
Blackwell Homes
Independent
Del Webb
Ryland Homes
Shea Homes
Kaufman & Broad
Centex Homes
Pulte Homes
Greenbrier Homes
Greystone
Standard Pacific
Signature Properties
Blackwell Homes
Neal Road Sanitary Landfill (Butte County)
Ox Mountain (Half Moon Bay)
Red Hill (Calaveras Co.)
Calaveras Cement (San Andreas)
Central Landfill (Yolo Co.)
Central Landfill (Palo Alto)
Western Placer Recovery (Roseville)
Dunnigan Burn Dump (Dunnigan)
Truckee Dump Site
Pescadero Landfill Closure
Rock Creek Solid Waste Facility
John Smith Landfill
Sacramento Area Flood Control District
American River Flood Control Districts
Santa Clara Valley
Feather River
Yuba River
Alameda Flood Control
San Ramon Flood Control
Army Corps of Engineers
Southport Levee Improvements
Hagginwood Golf Course
San Mateo Golf Course
Golden Hills Wind Farms
Solano Wind Farms
SMUD McKenzie Solar
UC Davis Solar
Columbia Solar Energy Project
Whitehorn Solar
Panoche Valley Solar
Wheats Solar Civil
Warm Springs Dam
Castaic Dam
Bullards Bar Dam
Spicer Dam
McKay's Dam
San Luis Obispo Dam
Mustang Dam
Folsom Dam
Oroville Dam
Camp Fire
City of Santa Rosa Fire Restoration
Rim Fire - Yosemite Caltrans
Detwiler Fire
Rim Fire - Hetch Hetchy
Pocatello Fire
Clayton Fire
Angora Fire Recovery Project South Lake Tahoe
County of San Diego Firestorm
Butte Fire
Valley Fire
I-80 from S.F. to Nevada Border (various sections)
I-5 from L.A. to Oregon Border (various sections)
Hwy 50 Sacramento to Tahoe (various sections)
5-80 Altamont Pass
Route 4 Bypass Authority
Hwy 880/92
Grant Line Road/99 Interchance City of Elk Grove
Hwy 65 Bypass
Hwy 49 Improvements
I-580 / Isabel Ave.
Hwy 101
We have done work on every major freeway in the state of CA
San Francisco International
Lake Tahoe Airport
Travis Air Force Base
McClellan Air Force Base
Sacramento International Airport
Sacramento Executive Airport
Placerville Airport
Arcata Airport
Norman Y. Mineta San Jose Int. Airport
Stockton Airport
Beale Air Force Base
Bayfront Park (Monto Park)
Hagginwood Park (Sacramento)
Byxbe Park (Palo Alto)
City of Vacaville Park
Bay Meadow Racetrack
Golden Gate Racetrack
Bay Cities Paving & Grading, Inc.
Blattner Energy, Inc.
C.C. Myers
Desilva Gates
Doug Veerkamp Gen.Eng.Cont.
DR Horton
Ford Construction
Ghilotti Bros
Ghilotti Construction Co.
Goodfellow Bros.
Granite Contruction
Graniterock (DBA Pavex)
Kiewit Pacific
McGuire & Hester
MCM Construction
Mountain Cascade, Inc
Nordic Industries
O.C. Jones
R.G.W.
Shapell Homes
Shimmick Construction Co., Inc.
Swinterton Builders
Syblon-Reid
Teichert Construction
Viking Construction Company
U.S. Bureau of Interior
Integrated Waste Management
E.P.A.
Parks & Recreation
Water Resources
Cal Trans
U.S. Forestry Service
California State Water Quality Control Board
U.S. Army Corps of Engineers
Cities and Counties throughout California
Leviathan Mine
Alpha Mine
Barrick
Lincoln Mine
References
“SSEC is far and away the most experienced, reliable and capable erosion control contractor in Northern California. With environmental compliance being such an important part of our work, having SSEC on the team gives us and our clients the peace of mind that the erosion control work will be performed properly the first time and completed within the time constraints of the project.”
—Rich Hufford, Construction Manager, DeSilva Gates Construction
“The Oroville Dam emergency repair project had very difficult access and critical time constraints. We knew from past experience that SSEC was 110% dependable in performing every aspect of their work for the entire length of the project. They helped develop a detailed planning schedule and site map attack plan. They also demonstrated excellent coordination with our field managers, plus a high level of support and outstanding performance overall. We always knew, without a doubt, that whatever we had ready for Selby at any given time, they would come in and complete with no issues. When you have SSEC working on your project, you sleep soundly at night.”
—Lonnie S. Morelock, Project Manager, Kiewit Infrastructure West Inc.
“SSEC is able to meet the requirements of the different agencies, provide the manpower and meet the required schedules. Through the years they’ve been willing to experiment with new ways to accomplish what we need to protect our sites and have done whatever was necessary to complete the job. It’s been a great partnership for both our companies.”
—Steve Savage, Vice President of Land Development, Toll Brothers
“In the case of post-wildfire debris removal work, SSEC has the resources to respond. When we needed to complete work on several hundred building lots, they were able to provide the crews and equipment without a lot of notice. They’re responsive to our needs and consider all the details.”
—Pete Timmerman, Chief Estimator, Pacific States Environmental Contractors, Inc.
“When we have a wildfire that affects the highway, contractors need to be extremely responsive, quick and nimble to come out and restore the land as best as possible before the winter rains set in. If the right erosion control work isn’t completed there is a risk that debris and mudflow can come across the highway. SSEC has performed well during emergency work, actively gives feedback in our annual contractor meetings and contributes to the development of our contract’s standard language.”
—Jack Broadbent, Supervising Landscape Architect, Caltrans
“Prior to procuring SSEC’s services, we were concerned with meeting SWPPP sediment erosion containment, BMP maintenance through the extended winter construction seasons and the installation of jute netting coir fabric soil stabilization measures. SSEC’s proactive management style and excellent reputation in meeting any and all erosion control challenges on levee embankment projects led to the submittal and subsequent acceptance of several value engineering concepts. This included BMP installation, modifications, substitutions, and quantity reductions, which resulted in substantial costs savings for the project. Their professional field crews anticipated challenges in advance, worked tirelessly to meet all stringent erosion control requirements, ensured the project was completed on schedule, and executed all erosion control measures to perfection. If you’re looking for proactive Contractor with the expertise and foresight to successfully manage erosion control challenges on your project, I’d highly recommend SSEC. From the top down you will get a commitment to excellence, unsurpassed expertise, honest and transparent communication, and a passion for performance.”
—J.J. Johnson, Sr. Project Director, AECOM Energy & Construction, Inc
“On behalf of the lnquip Associate’s team, I would like to extend our appreciation for the work your crews have performed for us. Every set back they’ve had was diligently worked around to continue to complete the work as best they could. All daily reports and project required documents were turned in at the end of each day. The crews we’ve worked with for both the Reach I and Reach H projects, have been more than accommodating. They’ve always gone the extra mile to ensure we are satisfied.
We greatly appreciate working with the Selby’s team and will definantly be working with you in the future.”
—Richard A. Hill, Project Superintendent, INQUIP Associates, Inc.