About the Project
SSEC assisted with the addition of a new lane on Highway 65 from Highway 80 to past Pleasant Grove Boulevard, changing on/off ramps on Standford Ranch Rd and Pleasant Grove Blvd.
Client
Caltrans / Flatiron Construction
Industries Served
Government AgencySolution / Service Type
Erosion Control
Bonded Fiber Matrix, Hydro Mulching, Hydroseeding, Straw Blowing, Hydraulically-Applied Compost
Sediment Control
Fiber Rolls/Wattles, Silt Fence, Erosion Control Blankets, Erosion Control Netting, Drain Inlet Protection, Reinforced Silt Fence
Wildlife & Environmental Services
ESA Fencing
Project Size
- 21 acres of Hydroseed, Straw & Tackifier
- 22 acres of Proganics
- 30,000 LF of Fiber rolls
- 5 acres of Netting
- 5 acres of Temporary Bonded Fiber Matrix
Challenges
Caltrans had specified a 4″ layer of compost, plus incorporation 6 to 8 inches into the soil for final erosion control before the hydroseed was to be installed. Traffic constrictions meant this would be nearly impossible unless we closed Highway 65 to arrange dump trucks to these areas. In addition, incorporation would be impossible due to the solid rock in certain areas.
How We Solved It
We value engineered the project, replacing the compost and incorporation with Proganics from Profile Products. Proganics is a biotic soil media that produces the proper nutrients and soil conditioning for the native seeds to flourish.
Project Video
Project Testimonials
“SSEC proposed innovative products for difficult site conditions early on. This helped improved the final product for slope protection and creek lining. SSEC communicated well, broke down items of work for better understanding, and worked fast.”
—Nic Cooper, Flatiron Construction